Operations Dashboard
Real-time traceability across all inbound material flows — updated 2 min ago
Total Vendors
142
Active Vendors
118
83.1% of total
Total Materials
384
Traceable Materials
341
88.8% traceable
Today's GRNs
17
6 pending inspection
Pending Inspections
23
3 overdue >48h
Total Stored Qty
4,821 MT
Storage Utilization
78.4%
94 of 120 locations
End-to-End Process Flow
Traceability pipeline — Vendor → Material → GRN → Storage
Vendor Master
Step 1 of 4
142
Total
118
Done
24
Pending
Material Master
Step 2 of 4
384
Total
341
Done
43
Pending
GRN Entry
Step 3 of 4
1,247
Total
1,198
Done
49
Pending
RM Storage
Step 4 of 4
1,198
Total
1,143
Done
55
Pending
Alerts & Exceptions
Missing Inspection Certificates
7 GRNs awaiting certificates — oldest: GRN-1238 (72h overdue)
Pending GRN Entries
12 deliveries received today with no GRN created yet
Bay D-1 Near Capacity
97% utilized — 3 MT remaining before overflow
Inactive Vendor Delivery
Delivery from VND-0089 (Inactive) — requires approval
Traceability Exception
3 materials in storage have no linked GRN heat number
Recent Activity
GRN #GRN-2026-1247 Generated
Tata Steel Ltd — HR Coil 5.5mm × 1250 — 24.5 MT
14 min ago · 08:42 AM
Material Placed in Bay C-1
Lot# TS-2026-0892 — 18.0 MT stored — Placed by R. Sharma
25 min ago · 08:31 AM
Inspection Certificate Uploaded
GRN #GRN-2026-1244 — JSPL Angul — Mill TC attached
41 min ago · 08:15 AM
Missing Certificate — GRN #1241
Essar Steel — Wire Rod 8mm — Cert overdue 52h
58 min ago · 07:58 AM
Vendor Created — Shyam Metalics
VND-0143 — Approved Sponge Iron Supplier — Added by A. Kumar
1h 26m ago · 07:30 AM
Material Code Added — SPONGE-FE-001
Sponge Iron DRI — Linked to Shyam Metalics (VND-0143)
1h 28m ago · 07:28 AM